nyc dot traffic standard drawings

A HIQA inspector must be present during the restoration. Programming activates roadways, sidewalks,and pedestrian plazas, andis essential to the ongoing success of any public space. PERMITTEE IS REQUIRED TO CALL NYCDOT HIQA OFFICE AT 212-839-2430 TO SCHEDULE THEIR RE-DIG. BQE Central Workshops. 8:30 AM to 4:30 PM, Manhattan APPLICANT INFORMATION (JOINT VENTURE), 1D. If repairs have not been made within the 75 day period, the City may make the repairs and bill the property owner for the cost of the repairs. Homeowners applying for Sidewalk Construction permits who intend to do the work themselves do not need to register. CLOSURE GRANTED AT REQUEST OF SCA LETTER. CANNOT WORK WHEN GOWANUS EXPRESSWAY HAS MORE THAN 1 LANE CLOSED SOUTHBOUND. The protected streets layer is current as of the previous business day. MAINTAIN ONE 12 FOOT LANE FOR LOCAL AND EMERGENCY ACCESS AT ALL TIMES, PLACE BARRICADES AND POST SIGNS MEETING "FEDERAL MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)" STANDARDS STATING "ROAD CLOSED TO THROUGH TRAFFIC", MAINTAIN 2 LANES FOR TRAFFIC, 1 LANE IN EACH DIRECTION, MAINTAIN 4 LANES FOR TRAFFIC, 2 LANES IN EACH DIRECTION. MUST COORDINATE WITH NYPD PRECINCT C.O. DOB approval is also required. WORK HOURS 9 PM TO 5 AM. Tel: (718) 430-1877, Brooklyn Expanding on thesmall sampling of recommended plants listed in previous versions of the Street Design Manual, DOT is now introducing its Plant Finder tool, offering a broadened database of plants that have been successfully used within the public right-of-way. The Office of Permit Management (Permit Office) provides extensive customer support for all applicants, registers permittees, receives and reviews for accuracy and completeness permit application submitted in person,and also reviews appropriate fees for both online and in-person applications. RESTORE PAVEMENT AFTER SUFFICIENT TIME FOR CURING. Deleted or Superseded Standard Sheet documents are accessible through the links in the second table below. 8:30 AM to 4:30 PM, Brooklyn Canopy design and construction must be in accordance with NYC DOT Standard Details of Construction. Where certification is unobtainable from the manufacturer, certification by the installer may be submitted instead. In some cases, applications and supporting documentation must be submitted in person. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Minimum slopes should be used wherever possible. When utility company representatives mark a location, they use colored flags and/or paint to identify the type of underground service: Streets can hide a complex infrastructure of underground utilities. Tel: 718-286-3170 NOVs carry a monetary fine and place the matter under the jurisdiction of the New York City Environmental Control Board (ECB). This category of permits applies to authorizations and permits required to place a canopy* over the sidewalk. (212) 839-8857 ALL UTILITY COMPANIES SHALL BE REQUIRED TO INSTALL THEIR UTILITIES &/OR CONDUITS A MINIMUM OF 18 INCHES BELOW THE ROAD WAY SURFACE OR BASE WHICHEVER IS GREATER AS PER NYC DOT HIGHWAY RULES & REGULATIONS 2-11(11)(VII). To request a release of a SAM hold, the borough ASHO must be contacted to discuss the work and allow the ASHO to determine the extent of the restoration requirements. - see, UTILITY COVER EMBARGO 0700-1000 1600-2000 WEEKDAYS, UTILITY COVER EMBARGO 0700-1000 1600-1900 WEEKDAYS, UTILITY COVER EMBARGO/HOLIDAY EMBARGO 0600-2400 WEEKDAYS/WEEKENDS. All CGL insurance policies must contain the following cancellation clause: In the event of expiration or cancellation of any such policy, the company will give the Permit Office at least 30 days' written notice prior to such expiration or cancellation. 4. "Backfill" refers to the bottom layer of the restoration. The permittee may apply for a renewal online, or in-person by accessing either theApplication to Renew Permitsor theApplication to Renew Governmental Permit(s). WORK 7 PM - 6 AM WEEKNIGHTS, NO WEEKENDS. DOT Street Lighting's Standard Drawings Book [PDF] includes Standard drawings for elements in the lighting catalogue. 120-55 Queens Blvd., Room 201 These holds can only be released by HIQA: Cobblestone (COB) hold All permits issued to work on a cobblestone street are automatically placed on hold until a HIQA inspector performs an inspection of the work site to establish existing conditions before work begins. All other times - (718) 433-3340, From 7:00 AM to 3:30 PM, Monday to Friday: (212) 839-9697/99 or 9688 Share long-term capital plans for planned repairs, upgrades and new Re-issued permits will not apply retroactively and are subject to new permit stipulations. ------- SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. ALL PERMITS MUST BE ON SITE. FULL BLOCK SEGMENT RESTORATION IS REQUIRED FOR THE LENGTH OF THE ROADWAY CURB TO CURB. Note: All distances indicate measurements from nearest edge of any object to closest edge of vault. The Glossary and definitions found in this Manual provide a brief explanation of NYC DOT terminology. 30-30 Thomson Avenue, 4th Floor WORK 8 AM TO 7 PM MONDAY TO FRIDAY. Orders, given orally or in writing, may be issued by the Commissioner to cease and desist work or to perform remedial action. (212) 839-8847 Canopy placement must be approved by the owner of the property to which the canopy will be attached. New York, NY 10038 Exceptions include, Ribbon sidewalks are appropriate in R1-R6 zoning districts; full sidewalks are used elsewhere, Sidewalks should be as wide as possible appropriate to foot traffic and available street width, Sidewalks should always be provided on both sides of the street, A parks internal path located near a roadway does not substitute for a sidewalk, If the sidewalk is more than 25 feet wide, there should be a clear path adjacent to the building line and an 8-foot clear path adjacent to the curbside furnishing zone. Applicants should indicate on the application, Application for Governmental Work Permit(s), their name and the name of the governmental agency or authority for which they are working. A copy of the form can also be foundin Appendix B, Forms. This category of permits applies to construction-related activities that take place within the street and are generally associated with construction work adjacent to the street. Transformer vaults are typically installed, owned and maintained by an electric utility company. NO NOISY OPERATIONS MAY OCCUR AFTER 10:00 PM. 165 Cadman Plaza East Please open each of the below search results in a new tab or window (using a right-click or CTRL-click) to alleviate an occasional error that may occur when using a browser's back button. Canopy authorizations and permits are required to place a canopy over the sidewalk. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE OPERATION OF THE STATION. Generally, applicants must provide business and contact information; proposed work information, including location, size of proposed work, and the work start and end date; type of permit(s) being requested; detailed work zone sketch; and date and signature of applicant or authorized representative. IN SUCH COMMERCIAL DISTRICTS IF MORE THAN 50% OF SIDEWALK FRONTAGE IS REPAIRED/REPLACED THE ENTIRE SIDEWALK MUST BE REPLACED IN CONFORMANCE WITH THE 4.13 C DEPT. PERMITTEE MAY BE REQUIRED TO REMOVE CONTAINER IMMEDIATELY UPON NOTIFICATION BY NYCDOT OR AUTHORIZED GOVERNMENT EMPLOYEE. THE TRAFFIC STIPULATIONS ON THIS PERMIT DO NOT GO INTO EFFECT AS LONG AS THE CONTRACTOR CONTINUES TO WORK NON-STOP, AROUND THE CLOCK, TO CORRECT THE EMERGENCY SITUATION. THE VMS BOARD MUST STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF SUCH CLOSURE. OCCUPY 12 FOOT WIDTH OF ROADWAY; FULL WIDTH OF ROADWAY RESTORED TO TRAFFIC WHEN SITE IS UNATTENDED. 55 Water Street, Concourse Level SPECIFICATION. CONTINUED: (II) FIFTEEN FEET OF HYDRANTS (III) A CROSSWALK OR PEDESTRIAN RAMP, NOR SHALL IT BE STORED OR PLACED IN ANY MANNER AS TO OBSTRUCT ANY CROSSWALK OR PEDESTRIAN RAMP. It also outlines principles for coordinating with NYC DOT when proposing excavation work to help make certain that excavation on streets occurs before or in conjunction with city street work, where practicable. NYC DOT registers permittees, and coordinates and issues permits for construction-related activity on streets. To request authorization for the installation of a canopy, an applicant must initiate the process at the HIQA office in the borough where the proposed canopy will be located. MAXIMUM OF 11 FEET OF ROADWAY MAY REMAIN CLOSED AFTER WORKING HOURS ONLY FOR CONCRTETE CURING. PHONE # 718-422-8700 FAX # 718-422-8710. BLKRES-RESTORE AS PER SKETCH #4 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Street Arterial Maintenance (SAM) hold A Street Opening Permit request to perform work on a protected street will automatically have a SAM hold placed on it if the proposed work start date is within 18 months of the street being resurfaced/reconstructed. REQUIRES BUREAU OF BRIDGES APPROVAL PRIOR TO WORK. SPEED REDUCERS ARE PROPOSED FOR THE ROADWAY OF YOR WORK AREA. Information on the restoration requirements for sidewalk repairs can be found inChapter 4 Executing Work in the Street. A CRIA statement is required if the closure is expected to last for more than 180 consecutive calendar days, as set forth inSection 2-16 of the Highway Rules. The following section provides information on some issues that may delay the issuance of a permit or that may lead to the revocation of a permit. Each canopy maintenance permit expires one year after the date of issuance, unless revoked sooner by NYC DOT. The Bronx MAINTAIN 1 - 11 FOOT LANE ON ONE-WAY STREETS AND TWO 11 FOOT LANES ON TWO-WAY STREETS. NYC Parks & Recreation WORK HOURS ARE NORTHBOUND 7 AM TO 3 PM OR SOUTHBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE NORTHBOUND 10 AM TO 4 PM OR SOUTHBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS NORTHBOUND 7 AM TO 3 PM OR SOUTHBOUND 10 AM TO 6 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE NORTHBOUND 10 AM TO 6 PM OR SOUTHBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE EASTBOUND 10 AM TO 4 PM OR WESTBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 6 PM, MONDAY THROUGH FRIDAY, THIS PERMIT IS VOID IF INSURANCE IS NOT RENEWED TO COVER PERIOD OF THIS PERMIT, WORK HOURS ARE EASTBOUND 10 AM TO 6 PM OR WESTBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, THE PERMITTEE IS REQUIRED TO INSTALL, MAINTAIN, AND REMOVE ALL NECESSARY TEMPORARY PARKING AND REGULATORY SIGNS AND PAVEMENT MARKINGS AND RESTORE TO THEIR ORIGINAL CONDITION PER NYCDOT STANDARDS PRIOR TO THE EXPIRATION OF THE PERMIT. Failure to comply with an order issued by the Commissioner may result in criminal or civil penalties. NYC DOT inspects sidewalks for defects and when a defect is identified, a Sidewalk Violation is issued to the property owner and a copy is submitted to the County Clerk's office. Tel: (212) 788-6600, New York City Landmarks Preservation Commission (LPC) MUST MAINTAIN 1 SOUTHBOUND AND 2 NORTH BOUND LANES AFTER ESTABLISHED WORK ZONE IS SET UP. All applications for construction or repair of a transformer vault must be accompanied by an electric utility company layout, and must comply with the minimum clearance requirements for transformer vaults unless an approval or waiver is obtained from the appropriate agency or utility (more information is available in. The completed Permittee Registration Application and other required documents must be submitted in person to the NYC DOT central Permit Office to complete the registration process. Staten Island, NY 10301 RESTORATION OF ROADWAY WHICH HAS RED COLORED BUS LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF TERACOTTA #103856 RIDE-A-WAY COATING MATER'L MFG'D BY INTERGRATED PAVING CONCEPTS INC OR EQUIVALENT. Long Island City, NY 11101 MAINTAIN 1 - 11 FOOT LANE FOR 2 WAY THRU TRAFFIC W/FLAGGERS AT EACH END OF WORK ZONE. The applicant must satisfy all of the requirements listed in section 2-02(a) (3) of the. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Standard Drawings are not currently available for download from the shaded states. 8:30 AM to 4:30 PM, Staten Island WORK INCLUDES: CURB/SIDEWALK REPAIR AS NEEDED; ROADWAY MILLING/REPAIR AND RESURFACING; REMOVAL OF CENTER MEDIAN; RESETTING UTILITY OPENING; REMOVAL/REINSTALLATION OF TRAFFIC SIGNALS INCLUDING CONDUIT; INSTALLATION OF PAVEMENT MARKINGS AND PARKING SIGNAGE. Worker's Compensation Insurance. This information should be used to plan work before streets go into protected street status. New York City Department of Transportation OCCUPY ONE 11 FOOT LANE 10 PM TO 12 PM NIGHTLY. New York, NY 10007-1216 Plumbers*: Enter the plumber's license number and name on license (if applicable). 59 Maiden Lane, 34th Floor PERMITTEE MUST EMAIL DEP AT. Different from DOB, DOT plans requires 600 PSF live loads on all sidewalk doors, gratings, covers and vault structures. New York, NY 10041 Office hours: 8:30 AM-4:30 PM, Queens A single PDF of the 619 Standard Sheets is available at the . Tel: (718) 482-4825. All other times: (718) 433-3447, The Bronx and North Queens (north of the Long Island Expressway) THIS STIP VOIDS ANY/ALL OTHER CONFLICTING STIPS ON THIS PERMIT UNLESS ACCOMPANIED WITH VARIANCE STIP VAR001. The New York City Department of Transportation (NYC DOT) has adopted specifications and regulations stipulating how street work must be performed in order to minimize disruption and maintain the integrity of the street surface. NYC DOT project locations, protected streets, and other maps are available online at the Department of Information Technology & Telecommunications (DoITT) NYCityMap website and the DOTMap portal. A $35 filing fee is required for all vault applications. 16 Court Street, 7th Fl. The suspension does not apply to emergency authorizations and permits (see Section 3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings). Under the surface, the same streets support the city's water, sewer, power and telecommunications infrastructure, as well as its subway tunnels and building vaults. NYPD AGENTS AND VMS BOARDS REQUIRED AS PER MEC01-36. Questions regarding permit registration or application processes can be directed to any Permit Office. LIGHTS MUST BE INSTALLED PRIOR TO 11/16 AND REMOVED BETWEEN 01/02 AND 01/15. Telephone inquiries: 8:30 AM-4:30 PM, Staten Island WORK NIGHTLY 9 PM - 6 AM SUNDAY NIGHT TO FRIDAY MORNING AND 9 PM FRIDAY TO 6 AM SUNDAY. MAY STORE TOOL CART IN PARKING LANE DURING NON-WORKING HOURS. BLNRES-RESTORE AS PER SKETCH #5 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. FULL SIDEWALK CLOSURE WITH WALKWAY IN ROADWAY, WEEKDAY NIGHTS 7PM TO 6AM AND FRI NIGHT 7PM THRU MON 6AM. the Manual on Uniform Traffic Control Devices, a publication issued by the Federal Highway Administration containing the basic principles that govern the design and use of traffic control devices for all streets, highways, bikeways, and private roads open to public travel. Information on restoration requirements following street openings/excavations can be found inChapter 4 Executing Work in the Street. In some cases, applications and supporting documentation must be submitted in person, however the majority of permit applications may be submitted online. THIS PERMIT ALLOWS FOR INSTALLATION OF TEMP ROADWAY/PAVEMENT MARKINGS AND/OR TEMP CONSTRUCTION REGULATORY SIGNS AS PER APPROVED MPT PLANS. To request release of a Revenue hold, the permittee must contact NYC DOT's Fiscal Affairs Office to arrange for payment of outstanding bills. COLORED ROADWAY AND OR SPECIAL MARKINGS ARE LOCATED ON THE ROADWAY OF YOUR PROPOSED WORK AREA. The organization of the Street Works Manual generally follows the chronological process of planning and undertaking work in the street. A statement of the basic construction details including type, description and color of the canopy covering; type, diameter and gauge of all supporting members; description of the frame, wind bracing assembly and sidewalk and building fastenings; description of proposed lettering on the canopy covering including exact wording and dimensions thereof; three 5 inch by 7 inch photographs of the proposed site. A sidewalk is the portion of a street, intended for the use of pedestrians, between the roadway and adjacent property lines. Further information is available in Section 2-02 (c) of Highway Rules. Further information on responding to ECB violations may be found on the ECB website. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE SOUTHEAST QUADRANT OF THE INTERSECTION. Any work is subject to suspension during an NYC DOT-issued. Following are the specific steps for canopy authorizations and permits: A permit must be obtained to install the canopy at the approved location (Erect Canopy Permit from the "01" Street Opening Permit series). DOT is also testing solar-powered lighting at select locations in flood-prone areas. Standard Sheets are available both in the US Customary units accessible below and in Metric units. This number should be kept confidential and only used to apply for NYC DOT permits. OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE. (212) 839-2480 One tool highlighted in this chapter is DOTMap, a data sharing initiative that allows for better coordination of planned street reconstruction and resurfacing activities with other street excavation work. Questions regarding permit registration can be directed to the central Permit Office. ON WEEKDAYS FROM 6AM TO 7PM MUST WORK BEHIND BARRIER WHILE MAINTAINING HALF SIDEWALK (MIN 5 FEET) FOR PEDESTRIANS AND NO USE OF ROADWAY. Designers and contractors should refer to the specifications listed below with special attention to the Construction & Material Specifications; Highway Lighting, Traffic Control, and Intelligent Transportation . (See Chapter 4, Section 4.5 Street Construction Inspections and Enforcement regarding the circumstances in which summonses/NOVs may be issued.). In order to apply for an embargo waiver, a Request for Roadway/Sidewalk Permits during Embargo Periods form must be submitted for review and consideration to the Permit Office. Bronx, NY 10461 This form cannot be used if the permit has already expired. This category also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. APPLICANT INFORMATION (SOLE PROPRIETORSHIP). 42 Broadway Concretemust be poured and finished in accordance with NYC DOT Standard Highway Specifications. Check each borough in which the applicant expects to work. Upon completion of this action, the hold(s) will be released. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. FULL CORNER QUADRANT RESTORATION IS REQUIRED FOR ALL CORNER QUADRANTS EXCAVATED. Applicants must first submit an Emergency Authorization Number Form. Customer Service: (212) 566-0042, Queens If the work is more than 100 feet away from the bridge structure, applicants must send a certification by e-mail stating so. Office hours: 8:30 AM-3:30 PM (in person) WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF ANY OTHER JURISDICTION SUCH AS PRIVATE PROPERTY, STATE, FEDERAL ETC., IT IS THE PERMITTEES RESPONSIBILITY TO DETERMINE THE PROPERTY OWNER AND OBTAIN THE WRITTEN APPROVAL. Permit Review is the process by which NYC DOT reviews permit applications and supporting documentation and makes determinations regarding the issuance of permits and permit stipulations. 8:30 AM to 4:30 PM, South Queens (south of the LIE) NYC DOT has a separate procedure for obtaining permits for emergency street opening/excavation work so that applicants can expeditiously obtain such permits. FULL WIDTH OF SIDEWALK AND ROADWAY MUST BE RESTORED AFTER WORKING HOURS. TO FRI. OTHER TIMES OCCUPY 11 FEET ADJACENT TO SOUTH CURB ONLY. The Bureau is comprised of two offices: All work within the street requires a NYC DOT permit to minimize construction impacts. Advance notice and coordination of planned street work is one of the most effective tools for reducing the number of street excavations, especially on streets that are scheduled to be resurfaced or reconstructed. A CITYBENCH IS/WILL BE LOCATED ON THIS STREET. VIOLATORS SHALL BE FINED AND PERMITS WILL BE SUSPENDED FOR NON COMPLIANCE. PERMITTEE MUST NOTIFY NYPD/TRAFFIC MANAGEMENT CENTER 48 HOURS PRIOR TO CHANGING ANY SIGNS/MARKINGS. PHONE#508-429-6023. Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) > 619 Work Zone Traffic Control 619 SHEETS EFFECTIVE BEFORE LETTING OF MAY 1, 2022 ARE AVAILABLE IN THE TABLES BELOW Notes: 1. See, Sidewalks must conform to ADA requirements for a minimum clear-path width and provision of spaces where wheelchair users can pass one another or turn around, Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas, Sidewalks in low-rise residential areas should be at least 5 feet wide, Wherever possible, sidewalk cross-slope should not be greater than 2%, Sidewalks must meet load-bearing, friction, and other requirements per relevant standard specifications and regulations, Color of detectable warning strips on pedestrian ramps should contrast with surrounding pavement: red for, The area within 18 inches of the curb should be kept free of all obstructions, New York City Mayors Executive Order No.22 of 1995 (the Clear Corner Policy) states that to the maximum extent possible, structures and objects should not be placed in the corner quadrant, For recommended clearances between obstructions, see, Include planted areas and stormwater source controls within sidewalks wherever possible when a maintenance partner is identified, If work includes tree planting, consider the location of utility infrastructure, including DEP sewers and water mains, Maximize trees and other green cover wherever clearance allows. 95 Prospect Park West MAY WORK 24/7, OCCUPY CURB LANE, ALL EQUIPMENT, STORAGE OF MATERIAL ALLOWED. The full list of Canopy Permit types is shown in the table. A PORTION OF THE SIDEWALK MAY REMAIN CLOSED OFF FOR CONCRETE CURING DURING POLE INSTALLATION PROVIDED A MINIMUM 5-FOOT CLEAR PATH FOR PEDESTRIANS IS MAINTAINED ON THE SIDEWALK AT ALL TIMES. Contact PEU for further information regarding the procedure to obtain initial and final approval for a transformer vault. OFFICE. Download about 619-011: Work Zone Traffic Control General Tables & Legend; General Information 619-012: Sign Table Keywords: Sign, Table. NYC DOT's mission is to provide for the safe, efficient and environmentally responsible movement of pedestrians, goods, bicycles and vehicular traffic on the streets of the city of New York. If the installed canopy passes final inspection, HIQA releases the CAN hold on the canopy maintenance permit and notifies the original applicant. All public and private actions must comply with all applicable laws, rules, and regulations, not solely those listed below. 311 (or 212-NEW-YORK outside the City) Coordination aims to reduce street excavation work on recently repaved streets. Asingle PDF of the 619 Standard Sheets is available attheOfficial Electronic Standard Specifications and Standard Sheets website. WALKWAY IN CLOSED LANE. If the applicant does not accept the permit stipulations, he or she can request a review with the PM. A permit is required to place any construction trailer or similar structure in the street. This category of permits applies to any repairs, replacements or new sidewalk installations. Permit applications near bridges are subject to approval by the Division of Bridges.

Union County Jail Mugshots, David Ferguson Gofundme, Articles N

nyc dot traffic standard drawings